No. | Bidang Studi | Jenjang | Gelar | Perguruan Tinggi | Tahun Lulus |
1 | * | S1 | Insinyur | Universitas Sriwijaya | 1987 |
2 | * | S2 | N/A |
No. | Nama Jabatan fungsional | Tanggal Mulai |
1 | Lektor | 01-10-2005 |
2 | Lektor | 01-11-2001 |
No. | Periode | Program Studi | Mata Kuliah | Nama Kelas | Rencana Pertemuan | Realisasi Pertemuan |
1 | 2003/2004 Ganjil | - Teknik Sipil | TKS-343 - IRIGASI I | 01 | 16 | 12 |
2 | 2003/2004 Ganjil | - Teknik Sipil | TKS-343 - IRIGASI I | 02 | 16 | 12 |
3 | 2003/2004 Genap | - Teknik Sipil | TSK352* - IRIGASI DAN BANGUNAN AIR | 02 | 16 | 12 |
4 | 2004/2005 Ganjil | - Teknik Sipil | TSK352* - IRIGASI DAN BANGUNAN AIR | 01 | 16 | 12 |
5 | 2004/2005 Genap | - Teknik Sipil | TSD252** - REKAYASA HIDROLOGI | 02 | 16 | 12 |
6 | 2004/2005 Genap | - Teknik Sipil | TSD252** - REKAYASA HIDROLOGI | 01 | 16 | 12 |
7 | 2005/2006 Ganjil | - Teknik Sipil | TSK352 - IRIGASI DAN BANGUNAN AIR | 01 | 16 | 9 |
8 | 2005/2006 Ganjil | - Teknik Sipil | TSK352 - IRIGASI DAN BANGUNAN AIR | 02 | 16 | 9 |
9 | 2005/2006 Ganjil | - Teknik Pertambangan | TKE-271 - TEKNIK TENAGA LISTRIK | 01 | 16 | 16 |
10 | 2005/2006 Genap | - Teknik Sipil | TSK457** - TRANSPORT SEDIMEN | 01 | 16 | 12 |
11 | 2006/2007 Ganjil | - Teknik Sipil | TSD252 - REKAYASA HIDROLOGI | 03 | 16 | 9 |
12 | 2006/2007 Genap | - Teknik Sipil | TSD123 - PENGEMBANGAN WILAYAH | 02 | 8 | 8 |
13 | 2006/2007 Genap | - Teknik Sipil | TSD-243 - MEKANIKA TANAH II | 04 | 12 | 12 |
14 | 2006/2007 Genap | - Teknik Sipil | TSD263* - ANALISA STRUKTUR I | 02 | 12 | 12 |
15 | 2007/2008 Ganjil | - Teknik Sipil | TSK201 - PENGUKURAN DAN PEMETAAN | 03 | 14 | 14 |
16 | 2007/2008 Ganjil | - Pendidikan Teknik Mesin | GPT-353 - PNEUMATIK DAN HIDRAULIK | 08 | 16 | 8 |
17 | 2007/2008 Ganjil | - Teknik Sipil | TSD364* - ANALISIS STRUKTUR II | 02 | 14 | 14 |
18 | 2007/2008 Ganjil | - Pendidikan Teknik Mesin | GPT-355 - ALAT BERAT | 08 | 16 | 8 |
19 | 2007/2008 Genap | - Teknik Sipil | TSK201 - PENGUKURAN DAN PEMETAAN | 03 | 14 | 14 |
20 | 2007/2008 Genap | - Teknik Sipil | TSD364* - ANALISIS STRUKTUR II | 02 | 14 | 14 |
21 | 2008/2009 Ganjil | - Teknik Sipil | TEK-232 - PENGETAHUAN ENERGI | 01 | 16 | 9 |
22 | 2008/2009 Ganjil | - Teknik Sipil | TKS-455 - MEKANIKA REKAYASA III | 02 | 16 | 9 |
23 | 2008/2009 Genap | - Teknik Sipil | TSK461 - DINAMIKA STRUKTUR DAN REKAYASA GEMPA | 04 | 8 | 8 |
24 | 2008/2009 Genap | - Teknik Sipil | TSK462 - PERANCANGAN DENGAN BANTUAN KOMPUTER | 04 | 8 | 8 |
25 | 2008/2009 Genap | - Teknik Sipil | TSD251 - MEKANIKA FLUIDA | 02 | 16 | 9 |
26 | 2009/2010 Ganjil | - Teknik Sipil | TSK352* - IRIGASI DAN BANGUNAN AIR | 01 | 0 | 0 |
27 | 2009/2010 Ganjil | - Teknik Sipil | TSK352* - IRIGASI DAN BANGUNAN AIR | 02 | 0 | 0 |
28 | 2009/2010 Genap | - Teknik Sipil | TKS34308 - IRIGASI DAN BANGUNAN AIR | 092P2 | 16 | 16 |
29 | 2012/2013 Genap | - Teknik Sipil | TSK352** - IRIGASI DAN BANGUNAN AIR | V | 0 | 0 |
30 | 2013/2014 Ganjil | - Teknik Sipil | TSK352* - IRIGASI DAN BANGUNAN AIR | 1 | 0 | 0 |
31 | 2013/2014 Ganjil | - Teknik Sipil | TKS60811 - SIMULASI DAN PENGENDALIAN SDA | 131P1 | 4 | 4 |
32 | 2013/2014 Ganjil | - Teknik Sipil | TKS51411 - MANAJEMEN & KELEMBAGAAN SUMBERDAYA AIR | 131P1 | 4 | 4 |
33 | 2013/2014 Genap | - Teknik Sipil | TKS51611 - KETERSEDIAAN DAN KWALITAS SUMBER DAYA AIR | 132P1 | 4 | 4 |
34 | 2013/2014 Genap | - Teknik Sipil | TKS51711 - KEBUTUHAAN AIR | 132P1 | 5 | 5 |
35 | 2013/2014 Genap | - Teknik Sipil | TKS35010 - PELABUHAN MARITIM | 132P1 | 16 | 16 |
36 | 2013/2014 Genap | - Teknik Sipil | TKS51811 - KONSERVASI LAHAN & KONSERVASI SDA | 132P1 | 8 | 8 |
37 | 2013/2014 Genap | - Teknik Sipil | TSK374* - PELABUHAN MARITIM | 2 | 16 | 16 |
38 | 2014/2015 Ganjil | - Teknik Sipil | TKS45610* - TEKNIK RAWA | 1 | 8 | 8 |
39 | 2014/2015 Ganjil | - Teknik Sipil | TKS34210 - IRIGASI DAN BANGUNAN AIR | 141P1 | 5 | 5 |
40 | 2014/2015 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 142L1 | 6 | 6 |
41 | 2014/2015 Genap | - Teknik Sipil | TKS35010*** - PELABUHAN MARITIM | 1 | 8 | 8 |
42 | 2015/2016 Ganjil | - Teknik Sipil | TKS51411 - MANAJEMEN & KELEMBAGAAN SUMBERDAYA AIR | 151P1 | 5 | 5 |
43 | 2015/2016 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 154L1 | 8 | 8 |
44 | 2015/2016 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 151P1 | 8 | 8 |
45 | 2015/2016 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 151L1 | 8 | 8 |
46 | 2015/2016 Ganjil | - Teknik Sipil | TKS60811 - SIMULASI DAN PENGENDALIAN SDA | 151P1 | 5 | 5 |
47 | 2015/2016 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 152P1 | 5 | 5 |
48 | 2015/2016 Genap | - Teknik Sipil | TKS45610 - TEKNIK RAWA | 152L1 | 5 | 5 |
49 | 2015/2016 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 152P1 | 5 | 5 |
50 | 2015/2016 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 152L1 | 8 | 8 |
51 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152P3 | 5 | 5 |
52 | 2015/2016 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 152P3 | 6 | 6 |
53 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152L1 | 5 | 5 |
54 | 2015/2016 Genap | - Teknik Sipil | TKS45610 - TEKNIK RAWA | 152L2 | 5 | 5 |
55 | 2015/2016 Genap | - Teknik Sipil | TKS35010 - PELABUHAN MARITIM | 152L2 | 5 | 5 |
56 | 2015/2016 Genap | - Teknik Sipil | TKS35010 - PELABUHAN MARITIM | 152L1 | 5 | 5 |
57 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152P2 | 5 | 5 |
58 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152L3 | 5 | 5 |
59 | 2015/2016 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 152L2 | 5 | 5 |
60 | 2015/2016 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 152L2 | 5 | 5 |
61 | 2015/2016 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 152P2 | 5 | 5 |
62 | 2015/2016 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 152L1 | 5 | 5 |
63 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152P1 | 5 | 5 |
64 | 2015/2016 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 152P2 | 5 | 5 |
65 | 2015/2016 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152L2 | 5 | 5 |
66 | 2015/2016 Pendek | - Teknik Sipil | TKS240514 - HIDRAULIKA | 154P2 | 8 | 8 |
67 | 2015/2016 Pendek | - Teknik Sipil | TKS141314 - MEKANIKA FLUIDA | 154P1 | 8 | 8 |
68 | 2016/2017 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 161L1 | 16 | 8 |
69 | 2016/2017 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 161L1 | 8 | 8 |
70 | 2016/2017 Ganjil | - Teknik Sipil | TKS210214* - SURVEI DAN PEMETAAN | 161P1 | 8 | 8 |
71 | 2016/2017 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 163L1 | 5 | 5 |
72 | 2016/2017 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 161P1 | 5 | 5 |
73 | 2016/2017 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 161P3 | 8 | 8 |
74 | 2016/2017 Ganjil | - Teknik Sipil | TKS441614 - HIDRAULIC MODELLING (MODEL HIDROLIKA) | 161P1 | 8 | 8 |
75 | 2016/2017 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 161L2 | 5 | 5 |
76 | 2016/2017 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 161P2 | 8 | 8 |
77 | 2016/2017 Ganjil | - Teknik Sipil | TKS51411 - MANAJEMEN & KELEMBAGAAN SUMBERDAYA AIR | 161P1 | 4 | 4 |
78 | 2016/2017 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 161P2 | 5 | 5 |
79 | 2016/2017 Ganjil | - Teknik Sipil | TKS210214* - SURVEI DAN PEMETAAN | 161L2 | 16 | 8 |
80 | 2016/2017 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 162L2 | 6 | 6 |
81 | 2016/2017 Genap | - Teknik Sipil | TKS51811 - KONSERVASI LAHAN & KONSERVASI SDA | 162P1 | 8 | 8 |
82 | 2016/2017 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 162L1 | 5 | 5 |
83 | 2016/2017 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 162L2 | 5 | 5 |
84 | 2016/2017 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 162L1 | 6 | 6 |
85 | 2016/2017 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 162L2 | 5 | 5 |
86 | 2016/2017 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 162L3 | 5 | 5 |
87 | 2016/2017 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 162P3 | 6 | 6 |
88 | 2016/2017 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 162P3 | 5 | 5 |
89 | 2016/2017 Genap | - Teknik Sipil | TKS341414 - LOW LAND ENGINEERING (TEKNIK RAWA) | 162L1 | 5 | 5 |
90 | 2016/2017 Genap | - Teknik Sipil | TKS51711 - KEBUTUHAAN AIR | 162P1 | 8 | 8 |
91 | 2016/2017 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 152P2 | 5 | 5 |
92 | 2016/2017 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 162P3 | 5 | 5 |
93 | 2016/2017 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 162L3 | 5 | 5 |
94 | 2017/2018 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 171L2 | 8 | 8 |
95 | 2017/2018 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 171L1 | 8 | 8 |
96 | 2017/2018 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 171L1 | 8 | 8 |
97 | 2017/2018 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 171L2 | 8 | 8 |
98 | 2017/2018 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 171P2 | 8 | 8 |
99 | 2017/2018 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 171P3 | 8 | 8 |
100 | 2017/2018 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 171P2 | 8 | 8 |
101 | 2017/2018 Ganjil | - Teknik Sipil | TKS51411 - MANAJEMEN & KELEMBAGAAN SUMBERDAYA AIR | 171P1 | 5 | 5 |
102 | 2017/2018 Ganjil | - Teknik Sipil | TKS60811 - SIMULASI DAN PENGENDALIAN SDA | 171P1 | 5 | 5 |
103 | 2017/2018 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 171P1 | 8 | 8 |
104 | 2017/2018 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 171P1 | 8 | 8 |
105 | 2017/2018 Genap | - Teknik Sipil | TKS251614** - IRIGASI DAN BANGUNAN AIR | 172L1 | 5 | 5 |
106 | 2017/2018 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 172L1 | 5 | 5 |
107 | 2017/2018 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 172P2 | 5 | 5 |
108 | 2017/2018 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 172P2 | 5 | 5 |
109 | 2017/2018 Genap | - Teknik Sipil | TKS251614** - IRIGASI DAN BANGUNAN AIR | 172L2 | 6 | 6 |
110 | 2017/2018 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 172P1 | 5 | 5 |
111 | 2017/2018 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 172P3 | 6 | 6 |
112 | 2017/2018 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 172L2 | 5 | 5 |
113 | 2017/2018 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 172P1 | 5 | 5 |
114 | 2017/2018 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 172L1 | 5 | 5 |
115 | 2017/2018 Pendek | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 174P2 | 16 | 16 |
116 | 2017/2018 Pendek | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 174L1 | 16 | 16 |
117 | 2017/2018 Pendek | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 174L1 | 16 | 16 |
118 | 2017/2018 Pendek | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 174L2 | 16 | 16 |
119 | 2017/2018 Pendek | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 174P1 | 16 | 16 |
120 | 2018/2019 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 181P1 | 8 | 8 |
121 | 2018/2019 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 181P2 | 8 | 8 |
122 | 2018/2019 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 181L1 | 5 | 5 |
123 | 2018/2019 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 181P3 | 5 | 5 |
124 | 2018/2019 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 181L2 | 8 | 8 |
125 | 2018/2019 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 181L2 | 5 | 5 |
126 | 2018/2019 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 181L1 | 8 | 8 |
127 | 2018/2019 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 181P2 | 5 | 5 |
128 | 2018/2019 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 181P1 | 5 | 5 |
129 | 2018/2019 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 182P3 | 5 | 5 |
130 | 2018/2019 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 182P1 | 6 | 6 |
131 | 2018/2019 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 182L1 | 6 | 6 |
132 | 2018/2019 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 182P2 | 6 | 6 |
133 | 2018/2019 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 182L2 | 5 | 5 |
134 | 2018/2019 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 182P1 | 6 | 6 |
135 | 2018/2019 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 182P3 | 6 | 6 |
136 | 2018/2019 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 182L1 | 5 | 5 |
137 | 2018/2019 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 182P2 | 6 | 6 |
138 | 2018/2019 Genap | - Teknik Sipil | TKS251614 - IRIGASI DAN BANGUNAN AIR | 182L2 | 6 | 6 |
139 | 2018/2019 Pendek | - Teknik Sipil | TKS121114 - STATIKA | 184P1 | 8 | 8 |
140 | 2019/2020 Ganjil | - Teknik Arsitektur | TAA130214 - MEKANIKA TEKNIK | 191L1 | 16 | 16 |
141 | 2019/2020 Ganjil | - Teknik Arsitektur | TAA130214 - MEKANIKA TEKNIK | 191P1 | 16 | 16 |
142 | 2019/2020 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 191P2 | 5 | 5 |
143 | 2019/2020 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 191L2 | 5 | 5 |
144 | 2019/2020 Ganjil | - Teknik Sipil | TKS306218 - HIDROLOGI TEKNIK | 191L1 | 6 | 6 |
145 | 2019/2020 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 191P1 | 5 | 5 |
146 | 2019/2020 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 191L1 | 5 | 5 |
147 | 2019/2020 Ganjil | - Teknik Sipil | TKS306218 - HIDROLOGI TEKNIK | 191L2 | 6 | 6 |
148 | 2019/2020 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 192P1 | 5 | |
149 | 2019/2020 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 192P2 | 5 | |
150 | 2019/2020 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 192P2 | 8 | 8 |
151 | 2019/2020 Genap | - Teknik Sipil | TKS410114 - KERJA PRAKTEK DAN SEMINAR | 192L1 | 16 | 16 |
152 | 2019/2020 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 192P1 | 8 | 8 |
153 | 2019/2020 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 192L2 | 5 | 5 |
154 | 2019/2020 Genap | - Teknik Sipil | TKS47208 - KERJA PRAKTEK DAN SEMINAR | 192L1 | 16 | 16 |
155 | 2019/2020 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 192L2 | 16 | 8 |
156 | 2019/2020 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 192L1 | 16 | 8 |
157 | 2019/2020 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 192L1 | 5 | 5 |
158 | 2020/2021 Ganjil | - Teknik Sipil | TKS210214* - SURVEI DAN PEMETAAN | 201P1 | 8 | 8 |
159 | 2020/2021 Ganjil | - Teknik Arsitektur | TAA130214 - MEKANIKA TEKNIK | 201P1 | 16 | 16 |
160 | 2020/2021 Ganjil | - Teknik Arsitektur | TAA130214 - MEKANIKA TEKNIK | 201L1 | 16 | 16 |
161 | 2020/2021 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 201P1 | 5 | 5 |
162 | 2020/2021 Ganjil | - Teknik Sipil | TKS504318 - TEKNIK SUNGAI DAN RAWA | 201P2 | 5 | 5 |
163 | 2020/2021 Ganjil | - Teknik Sipil | TKS504318 - TEKNIK SUNGAI DAN RAWA | 201P1 | 5 | 5 |
164 | 2020/2021 Ganjil | - Teknik Sipil | TKS504318 - TEKNIK SUNGAI DAN RAWA | 201L1 | 5 | 5 |
165 | 2020/2021 Ganjil | - Teknik Sipil | TKS210214* - SURVEI DAN PEMETAAN | 201L1 | 8 | 8 |
166 | 2020/2021 Ganjil | - Teknik Sipil | TKS340614 - TEKNIK SUNGAI DAN ANGKUTAN SEDIMEN | 201L1 | 6 | 6 |
167 | 2020/2021 Ganjil | - Teknik Sipil | TKS504318 - TEKNIK SUNGAI DAN RAWA | 201L2 | 5 | 5 |
168 | 2020/2021 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 202P1 | 8 | 8 |
169 | 2020/2021 Genap | - Teknik Sipil | TKS351514 - MARINE PORT PLANNING (PELABUHAN MARITIM) | 202P1 | 5 | 5 |
170 | 2020/2021 Genap | - Teknik Sipil | TKS207118 - SURVEI DAN PEMETAAN | 202L1 | 5 | 5 |
171 | 2020/2021 Genap | - Teknik Sipil | TKS406218 - PERANCANGAN IRIGASI DAN DRAINASE | 202L1 | 5 | 5 |
172 | 2020/2021 Genap | - Teknik Sipil | TKS406218 - PERANCANGAN IRIGASI DAN DRAINASE | 202P1 | 5 | 5 |
173 | 2020/2021 Genap | - Teknik Sipil | TKS251614** - IRIGASI DAN BANGUNAN AIR | 202L1 | 5 | 5 |
174 | 2020/2021 Genap | - Teknik Sipil | TKS406218 - PERANCANGAN IRIGASI DAN DRAINASE | 202L2 | 5 | 5 |
175 | 2020/2021 Genap | - Teknik Sipil | TKS406218 - PERANCANGAN IRIGASI DAN DRAINASE | 202P2 | 5 | 5 |
176 | 2020/2021 Genap | - Teknik Sipil | TKS251614** - IRIGASI DAN BANGUNAN AIR | 202P1 | 5 | 5 |
177 | 2021/2022 Ganjil | - Teknik Sipil | TKS210214 - SURVEI DAN PEMETAAN | 211P1 | 8 | 8 |
178 | 2021/2022 Ganjil | - Teknik Sipil | TKS 207118 - SURVEI DAN PEMETAAN | 211L1 | 8 | 8 |
179 | 2021/2022 Ganjil | - Teknik Arsitektur | TAA130214 - MEKANIKA TEKNIK | 211L1 | 16 | 16 |
180 | 2021/2022 Ganjil | - Teknik Sipil | TKS 207118 - SURVEI DAN PEMETAAN | 211P2 | 8 | 8 |
181 | 2021/2022 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 211P2 | 8 | 8 |
182 | 2021/2022 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 211P1 | 8 | 8 |
183 | 2021/2022 Ganjil | - Teknik Sipil | TKS 207118 - SURVEI DAN PEMETAAN | 211P1 | 8 | 8 |
184 | 2021/2022 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 211L1 | 8 | 8 |
185 | 2021/2022 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 212P1 | 8 | 8 |
186 | 2021/2022 Genap | - Teknik Sipil | TKS 207118 - SURVEI DAN PEMETAAN | 212P1 | 8 | 8 |
187 | 2021/2022 Genap | - Teknik Sipil | TKS205418 - BANGUNAN HIDRAULIK | 212L1 | 5 | 5 |
188 | 2021/2022 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 212P2 | 8 | 8 |
189 | 2021/2022 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 212L2 | 5 | 5 |
190 | 2021/2022 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 212L1 | 5 | 5 |
191 | 2021/2022 Pendek | - Teknik Sipil | TKS 504318 - TEKNIK SUNGAI DAN RAWA | 214P1 | 8 | 8 |
192 | 2021/2022 Pendek | - Teknik Sipil | TKS 504318 - TEKNIK SUNGAI DAN RAWA | 214L1 | 8 | 8 |
193 | 2021/2022 Pendek | - Teknik Sipil | TKS 504318 - TEKNIK SUNGAI DAN RAWA | 214P2 | 8 | 8 |
194 | 2021/2022 Pendek | - Teknik Sipil | TKS 504318 - TEKNIK SUNGAI DAN RAWA | 214L2 | 8 | 8 |
195 | 2022/2023 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 221P1 | 8 | 8 |
196 | 2022/2023 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 221P2 | 8 | 8 |
197 | 2022/2023 Ganjil | - Teknik Sipil | TKS 504318 - TEKNIK SUNGAI DAN RAWA | 221P1 | 5 | 5 |
198 | 2022/2023 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 221L1 | 8 | 8 |
199 | 2022/2023 Ganjil | - Teknik Sipil | TKS504318 - TEKNIK SUNGAI DAN RAWA | 221L1 | 5 | 5 |
200 | 2022/2023 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 221L2 | 8 | 8 |
201 | 2022/2023 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 222P1 | 5 | 5 |
202 | 2022/2023 Genap | - Teknik Sipil | TKS3216 - BANGUNAN HIDRAULIK | 222L1 | 6 | 6 |
203 | 2022/2023 Genap | - Teknik Sipil | TKS3218 - TEKNIK SUNGAI DAN RAWA | 222L1 | 8 | 8 |
204 | 2022/2023 Genap | - Teknik Sipil | TKS3220 - PERENCANAAN DAN PENGENDALIAN PROYEK | 222L1 | 6 | 6 |
205 | 2022/2023 Genap | - Teknik Sipil | TKS3218 - TEKNIK SUNGAI DAN RAWA | 222P1 | 8 | 8 |
206 | 2022/2023 Genap | - Teknik Sipil | TKS2213 - HIDROLOGI TEKNIK + PRAKTIKUM | 222P2 | 5 | 5 |
207 | 2023/2024 Ganjil | - Teknik Sipil | TKS4108 - EROSI DAN SEDIMENTASI | 231P1 | 8 | 8 |
208 | 2023/2024 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 231P2 | 8 | 8 |
209 | 2023/2024 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 231P1 | 8 | 8 |
210 | 2023/2024 Ganjil | - Teknik Sipil | TKS306218 - HIDROLOGI TEKNIK | 231P1 | 5 | 5 |
211 | 2023/2024 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 231L2 | 8 | 8 |
212 | 2023/2024 Ganjil | - Teknik Sipil | TKS2106 - SURVEI DAN PEMETAAN + PRAKTIKUM | 231L1 | 8 | 8 |
Data tidak tersedia
Nomor | NIM | Nama Mahasiswa | Jenis Aktivitas | Judul Aktivitas | Tanggal Aktivitas | penguji Ke |
1 | 03022681419002 | SUNAYA WULANDARI | Tesis | ANALISIS KEBUTUHAN AIR RUMAH TANGGA DI KECAMATANGANDUS KOTA PALEMBANG | 03-11-2024 | 3 |
No. | Judul Penelitian | Lama Kegiatan | Tahun Pelaksanaan Ke | Dana Dikti | Dana Perguruan Tinggi | Dana Institusi Lain | Tahun Usulan | Tahun Kegiatan | Tahun Pelaksanaan |
1 | MODEL LAJU ANGKUTAN SEDIMEN PADA RENCANA PEMBUATAN EMBUNG DALAM LINGKUNGAN KAMPUS UNIVERSITAS SRIWIJAYA DI INDERALAYA | 2 | 1 | 0 | 70000000 | 0 | 2018 | 2018 | 2018 |
2 | TAHUN KE-2: MODEL LAJU ANGKUTAN SEDIMEN PADA RENCANA PEMBUATAN EMBUNG DALAM LINGKUNGAN KAMPUS UNIVERSITAS SRIWIJAYA DI INDERALAYA | 2 | 2 | 0 | 55000000 | 0 | 2019 | 2019 | 2019 |
3 | Pengolahan Air Sumur Bor di Fakultas Teknik Unsri dengan Proses Ultrafiltrasi | 1 | 1 | 0 | 15000000 | 0 | 2019 | 2019 | 2019 |
4 | FLOOD ANALYSIS, RISK, AND CONTROL: APPROACHES TOWARD SUSTAINABILITY | 3 | 3 | 0 | 0 | 60000000 | 2019 | 2021 | 2021 |
5 | Pengembangan Model Hidrologi pada Hulu Daerah Aliran Sungai Ogan | 1 | 1 | 0 | 30000000 | 0 | 2020 | 2020 | 2020 |
6 | Analisis Feeder pada Kawasan Perumahan yang Padat Penduduk di Kota Palembang untuk Menunjang Pengurangan Perubahan Iklim | 1 | 1 | 48000000 | 48000000 | 0 | 2021 | 2022 | 2022 |
7 | Model Sistem Drainase yang Berwawasan Lingkungan di Kawasan Perumahan Berbasis Hidrodinamika | 1 | 1 | 0 | 30000000 | 0 | 2021 | 2021 | 2021 |
8 | Analisa Indeks Kekuatan Sisa Dan Kehilangan Berat Flexible Pavement Warm Mix Wmac-Wc Dan Wmac-Bc Menggunakan Variasi Aspal Minyak, Aspal Karet Dan Aspal Buton | 1 | 1 | 1 | 30000000 | 1 | 2022 | 2022 | 2022 |
9 | Analisis Feeder pada Kawasan Perumahan yang Padat Penduduk di Kota Palembang untuk Menunjang Pengurangan Perubahan Iklim | 1 | 1 | 48000000 | 48000000 | 0 | 2022 | 2022 | 2022 |
No. | Judul | Jenis Publikasi | Nama Jurnal | Tanggal | Volume | Halaman | Penerbit |
1 | The Estimation of Total Sediments Load in River Tributary for Sustainable Water Resources Management | Prosiding seminar internasional | International Conference on SMART CITY Innovation 2018 | 15-03-2019 | 0 | Universitas Indonesia | |
2 | Pengolahan Air Sumur Bor Menggunakan Adsorben Fly-ash/ Zeolit dan Ultrafiltrasi | Jurnal nasional terakreditasi | Ilmu Lingkungan | 29-04-2020 | 18 | 193-199 | Program Pascasarjana Undip |
3 | Penerapan Teknologi GNSS RTK Berbiaya Terjangkau (Low-Cost) Untuk Survei dan Pemetaan Batas Lahan di Desa Tanjung Merbu dan Rambutan Kabupaten Banyuasin | Jurnal nasional | 01-12-2020 | 0 | Fakultas Teknik Universitas Sriwijaya | ||
4 | Identifikasi Kawasan Potensial untuk Penerapan Sistem Rainwater Harvesting di Kota Palembang dengan Pendekatan Geographic Information System | Hasil penelitian/pemikiran yang tidak dipublikasikan | 11-01-2021 | 0 | |||
5 | Kajian Pengendalian Banjir Sungai Bendung Kota Palembang dengan Sistem Pompa | Hasil penelitian/pemikiran yang tidak dipublikasikan | 20-09-2021 | 0 | |||
6 | Evaluasi Kapasitas Sistem Drainase dan Pemetaan Potensi Genangan Banjir di Kawasan Perumahan | Jurnal nasional terakreditasi | 01-12-2021 | 0 | Universitas Andalas | ||
7 | Analisis Feeder pada Kawasan Perumahan yang Padat Penduduk di Kota Palembang untuk Menunjang Pengurangan Perubahan Iklim | Hasil penelitian/pemikiran yang tidak dipublikasikan | 15-06-2022 | 0 | |||
8 | Analisa Indeks Kekuatan Sisa Dan Kehilangan Berat Flexible Pavement Warm Mix Wmac-Wc Dan Wmac-Bc Menggunakan Variasi Aspal Minyak, Aspal Karet Dan Aspal Buton | Prosiding seminar nasional | AVOER XIV | 31-07-2022 | 0 | UNIVERSITAS SRIWIJAYA |
Data tidak tersedia
Data tidak tersedia
Data tidak tersedia